Receipt of BM-ME's New PRD GOLD RC

BM-ME enhances its technical capacity through the acquisition of the PRD GOLD RC. The Operations Director led a delegation to the PRD team to supervise delivery, setup, and preliminary performance testing.

6/24/20252 min read

Ouagadougou , May 26, 2025

In line with its operational capacity enhancement strategy, BM-Mines et Environnement has formally received its latest-generation drilling rig: the PRD GOLG RC.

PRD GOLD RC de BM-ME
PRD GOLD RC de BM-ME
PRD GOLD RC de BM-ME
PRD GOLD RC de BM-ME
PRD GOLD RC de BM-ME
PRD GOLD RC de BM-ME
PRD GOLD RC de BM-ME
PRD GOLD RC de BM-ME

Engineered for high performance and trusted for its reliability, this new equipment signifies a key advancement in BM-ME's operational evolution.

A delegation led by BM-ME's Director of Operations, Mr Partice BOUGMA, visited the reception site to supervise the full procedure in collaboration with PRD's technical team, in charge of delivery, setup, and preliminary trials.

BM-ME Operations Director & PRD Team

Directeur des Opérations BM-ME ( Mr Patrice BOUGMA)
Directeur des Opérations BM-ME ( Mr Patrice BOUGMA)

"We are delighted and immensely proud to introduce the PRD GOLD RC: An equipment that combines power and performance at the highest level.

Far beyong a simple asset purchase, this investment marks a strategic leap in upgradind and scaling our operational capabilities.

This sends a strong and deliberate message to our partners, clients and entire ecosystem: Our ambition is growing, and we are embracing a more audacious, forward-looking vision.

I would like to extend my sincere thanks to our Administrator, Mr Sibila François YAMEOGO, and to all the teams (PRD, BM-ME), whose efforts made this acquisition possible."

Patrice BOUGMA

BM-Mines et Environnement Operations Director

BM-ME PRD GOLD RC
BM-ME PRD GOLD RC